A construction loan can fund both the purchase of a renovation project and the building works that follow. Funds are released in stages as work is completed, which means the structure of the loan differs materially from a standard home loan.
This article is intended for Canberra buyers who are considering a property requiring substantial works and who need to understand how construction finance is released, assessed and repaid. Lender policies vary, and the terms described below should be confirmed with the relevant lender.
What Is a Construction Loan for a Renovation Purchase?
A construction loan is a facility in which the loan amount is released progressively against the stages of building work, rather than being advanced in a single sum. For a renovation project, the facility is typically arranged so that the purchase and the works are considered together, subject to each lender's policy.
Lenders set their own terms, including the number of drawdowns, the repayment type during the build, construction time limits, inspection requirements, fees and rates. A buyer should therefore obtain these conditions in writing before exchanging contracts. The broader construction loans category covers new builds and renovation projects, and acceptance of a particular renovation scope remains at the lender's discretion.
How Progressive Drawdown Works and When Interest Is Charged
Under a progressive drawdown arrangement, interest is generally calculated on the amount drawn rather than on the full approved limit. Drawdowns are typically tied to the builder's progress claims, and inspection requirements vary by lender, so they should be confirmed before signing.
The following example is illustrative and uses a rate of 6.75% p.a. Consider a buyer whose facility has been partly drawn, with a balance of $200,000 after the initial stages of work. Interest on that balance is $13,500 a year, or $1,125 a month. After further claims for framing and fit-out, the drawn balance reaches $300,000. Interest at the same rate is then $20,250 a year, or $1,687.50 a month. The buyer should check that the higher repayments remain affordable at each stage and allow for delays.
The trade-off is that repayments increase with each drawdown, and delays in the build extend the period over which interest accrues. Fees vary by lender and should be confirmed before signing. The actual rate offered will depend on the lender and the buyer's circumstances.
How Do Lenders Assess Serviceability During a Build?
Lenders assess whether a borrower can meet repayments at an interest rate above the loan rate. APRA's prudential standard requires authorised deposit-taking institutions to assess new borrowers at a rate at least 3.0 percentage points above the loan product rate, and APRA confirmed on 28 May 2026 that this buffer remains at 3 percentage points. The buffer applies to new borrowers generally, including construction loans, and a lender may apply additional construction requirements.
Income that is less stable, such as bonuses or overtime, may be discounted by the lender. A buyer who relies on such income should expect the assessed figure to be lower than the headline amount. A borrowing capacity assessment before a contract is signed allows the buyer to understand the likely limit.
APRA's debt-to-income limit exempts finance for constructing new dwellings and purchasing newly built dwellings. The purchase and renovation of an existing property may not qualify, so the lender should confirm the treatment. The limit applies to an authorised deposit-taking institution's portfolio rather than to an individual borrower, and serviceability is still assessed as described above.
How Is the Loan-to-Valuation Ratio Calculated on a Construction Facility?
For prudential purposes, the loan amount in the loan-to-valuation ratio includes the outstanding balance, accrued interest and fees, and any undrawn committed amount. The undrawn portion of a construction facility is therefore counted from the outset.
Property value must be appraised using prudently conservative criteria. The value recorded at origination is maintained unless an updated valuation is obtained as part of a new loan application, or modifications unequivocally increase the value and a revised valuation confirms the increase. A buyer should accordingly not assume that completed works will immediately increase the value used by the lender.
Higher loan-to-valuation ratios attract higher capital requirements for lenders, and lenders mortgage insurance may be required depending on the lender and the deposit. Any such cost forms part of the buyer's total outlay. A comparison of facilities within the wider home loans range may assist in understanding these differences.
What Should a Buyer Review in the Building Contract?
A buyer should confirm that the building contract provides for a progress payment schedule that matches the lender's drawdown stages and that payments correspond to work actually completed. The buyer should confirm any ACT deposit and progress payment requirements with the builder, a licensed conveyancer or solicitor, and the ACT Government, and should negotiate the deposit and progress payments carefully. Legal advice on the contract is therefore prudent.
A fixed price building contract provides cost certainty for the agreed scope, although variations are typically priced separately. A cost plus contract carries the risk that the final cost exceeds early estimates. Lender requirements vary and should be confirmed in writing at the outset.
A buyer who already holds a loan may also wish to review whether refinancing the existing facility into a construction structure is appropriate, having regard to exit fees and the loss of any existing loan features.
Contingency Planning for Cost Variations
A buyer should hold funds outside the facility to cover variations, because the approved loan amount is generally fixed against the original scope. Renovation projects can reveal concealed conditions once works begin, and such items may fall outside the contract price.
In a scenario like this, a buyer who has retained a cash reserve is able to pay a variation directly and continue the progress payment schedule without seeking an increase to the facility, which would require further lender approval. The cost of holding such a reserve is that those funds are unavailable for other purposes during the build.
To discuss construction finance for a renovation purchase in Canberra, call one of our team or book an appointment at a time that works for you through our appointment page. General information in this article does not constitute personal financial or tax advice, and tax questions should be directed to your accountant.
Frequently Asked Questions
How is interest charged on a construction loan for a renovation?
Interest is generally calculated on the amount drawn rather than the full approved limit. Repayments therefore rise as each progress payment is released, and the terms depend on the lender.
Does a lender assess serviceability differently for a construction loan?
The APRA serviceability buffer applies to new borrowers generally, including construction loans, and a lender may apply additional construction requirements. Authorised deposit-taking institutions must assess new borrowers at a rate at least 3.0 percentage points above the loan product rate, and APRA confirmed this buffer on 28 May 2026.
Is the undrawn portion of a construction loan counted in the loan-to-valuation ratio?
Yes. For prudential purposes, the loan amount includes the outstanding balance, accrued interest and fees, and any undrawn committed amount.
Why should a buyer hold a cash reserve during a renovation build?
The approved loan amount is generally set against the original scope of works. A reserve allows variations to be paid directly without seeking a further lender approval.